Difference between revisions of "Taras Shevchenko Ukraine National Opera [Kiev] (Q8184)"

From CanonBase

Theatre building in Kiev, Ukraine

(‎Created claim: Redevelopment date (P104): 1930s)
(‎Created claim: Redevelopment date (P104): 1980s)
Property / Redevelopment date
 +
1980s
Timestamp+1980-00-00T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision10 years
Before0
After0
Property / Redevelopment date: 1980s / rank
 +
Normal rank
Property / Redevelopment date: 1980s / qualifier
 +
context: 1980s, under the direction of architect Boris Zhezherin, the theatre was reconstructed, during which the internal structure of the rooms changed. Grimerooms and rehearsal rooms became bigger, and a choral class appeared. The stage was also enlarged. Its area after the reconstruction is 824 square metres. The orchestra pit was re-equipped, which now accommodates about 100 musicians, and the old organ was replaced with a new one. The latter was made to the special order of the theatre by the company "Ridger-Klos" from the Czech Republic. Overall, the reconstruction significantly expanded the theatre's space. (English)

Revision as of 19:54, 14 June 2024

Theatre building in Kiev, Ukraine
  • Taras Shevchenko Ukraine National Opera
Language Label Description Also known as
English
Taras Shevchenko Ukraine National Opera [Kiev]
Theatre building in Kiev, Ukraine
  • Taras Shevchenko Ukraine National Opera

Statements

0 references
0 references
0 references
50°26'48.372"N, 30°30'44.676"E
0 references
Kiev Opera House 2012 01.JPG
3,008 × 2,000; 1.97 MB
0 references
0 references
0 references
29 September 1901Gregorian
0 references
1,683
0 references
Володимирська вулиця, 50
0 references
1930s
In the 1930s, the theatre was to be rebuilt, adding a "proletarian style" to its architecture. However, it ended up simply removing the aforementioned busts of composers from the times of the empire, and building an additional two-storey rehearsal room. (English)
0 references
1980s
1980s, under the direction of architect Boris Zhezherin, the theatre was reconstructed, during which the internal structure of the rooms changed. Grimerooms and rehearsal rooms became bigger, and a choral class appeared. The stage was also enlarged. Its area after the reconstruction is 824 square metres. The orchestra pit was re-equipped, which now accommodates about 100 musicians, and the old organ was replaced with a new one. The latter was made to the special order of the theatre by the company "Ridger-Klos" from the Czech Republic. Overall, the reconstruction significantly expanded the theatre's space. (English)
0 references

Timeline

 

Wikidata